Data center project · Pottawattamie County, Iowa
Project Lola (Edged, Council Bluffs)
Under construction · A two-building, roughly 200 MW Edged campus on land once approved for a logistics park. Also known as: Project Lola, OMA01, EDC Omaha Landco LLC.
- Status
- Under construction · as of Sept. 14, 2026
- Location
- Southeast of College Road and East Kanesville Boulevard (Highway 6), Council Bluffs · Pottawattamie County
- Status note
- Both buildings had topped out by mid-September 2026; groundbreaking was in October 2025.
- Power
- 200 MW
- Floor area
- 570,890 sq ft
- Developer and team
- Edged; EDC Omaha Landco LLC
- Utility
- MidAmerican Energy (two owner-operated substations planned)
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Sept. 14, 2026 Edged said both buildings, OMA01-1 and OMA01-2, had topped out. (Baxtel, Sept. 14, 2026)
- Oct. 2025 Construction began. (Baxtel, Sept. 14, 2026)
- June 2025 The council unanimously approved an amendment shrinking each building to about 285,445 square feet and lowering the height; Edged kept the 200 MW total. (DatacenterDynamics (republished by BeBeez International), June 11, 2025)
- 2024 The council approved the original plan for two 450,000-square-foot buildings and a MidAmerican substation. (DatacenterDynamics (republished by BeBeez International), June 11, 2025)
Conflicts and open questions
- The original 2024 approval date is given only as 'a year ago' (June 2025); exact date not found.
Have records about this project? Send them to tips@signaldata.org.