Data center campus · Elk Grove Village (1800 Nicholas Blvd., 2021 and 2055 Lunt Ave.), Cook County, Illinois

EdgeConneX Chicago campus (CHI01, CHI02, CHI03)

Operating as of Sept. 2024

Three EdgeConneX colocation buildings a short distance apart in the Elk Grove Village industrial park, presented by the operator as one Chicago campus. Also known as: CHI01, CHI02, CHI03.

Cite← Illinois data centers
Adams CountyAlexander CountyBond CountyBoone CountyBrown CountyBureau CountyCalhoun CountyCarroll CountyCass CountyChampaign CountyChristian CountyClark CountyClay CountyClinton CountyColes CountyCook CountyCrawford CountyCumberland CountyDe Witt CountyDeKalb CountyDouglas CountyDuPage CountyEdgar CountyEdwards CountyEffingham CountyFayette CountyFord CountyFranklin CountyFulton CountyGallatin CountyGreene CountyGrundy CountyHamilton CountyHancock CountyHardin CountyHenderson CountyHenry CountyIroquois CountyJackson CountyJasper CountyJefferson CountyJersey CountyJo Daviess CountyJohnson CountyKane CountyKankakee CountyKendall CountyKnox CountyLake CountyLaSalle CountyLawrence CountyLee CountyLivingston CountyLogan CountyMacon CountyMacoupin CountyMadison CountyMarion CountyMarshall CountyMason CountyMassac CountyMcDonough CountyMcHenry CountyMcLean CountyMenard CountyMercer CountyMonroe CountyMontgomery CountyMorgan CountyMoultrie CountyOgle CountyPeoria CountyPerry CountyPiatt CountyPike CountyPope CountyPulaski CountyPutnam CountyRandolph CountyRichland CountyRock Island CountySaline CountySangamon CountySchuyler CountyScott CountyShelby CountySt. Clair CountyStark CountyStephenson CountyTazewell CountyUnion CountyVermilion CountyWabash CountyWarren CountyWashington CountyWayne CountyWhite CountyWhiteside CountyWill CountyWilliamson CountyWinnebago CountyWoodford CountyEdgeConneX Chicago campus (CHI01, CHI02, CHI03) · Operating · 53.4 MW
Power53.4MW reported · stated

Who is behind it

ProjectEdgeConneX Chicago campus (CHI01, CHI02, CHI03)Also: CHI01, CHI02, CHI03
Developer and teamEdgeConneX
End userNot found in the recordsNot yet named in any record or credited report we have found.

The record, newest first

  1. The operator's Chicago data sheet gave CHI01 at 24 MW and CHI02 at 7 MW and showed CHI03 (22.4 MW) as arriving soon. (EdgeConneX, Sept. 1, 2024)

  2. Village officials endorsed a Class 6B tax break for a two-story, 22 MW, 167,000 sq ft building on Lunt Avenue estimated at $210 million. (DatacenterDynamics, Feb. 1, 2022)

  3. Reporting described a $62 million plan to convert a warehouse at 2021 Lunt Ave. into a 7 MW data center, with village backing for a Class 6B tax break. (Daily Herald, Aug. 23, 2021)

Conflicts and open questions

  • Treated as one campus because the operator's data sheet presents the three buildings together; CHI01 is on Nicholas Blvd., the other two on Lunt Ave.
  • Coordinates approximate, near Lunt Ave. in Elk Grove Village.
  • Under 50 MW per building; campus sum is 53.4 MW.
  • The data sheet itself is undated; its date is taken from the upload path (2024/09).

The full record

Status note
The operator's Chicago data sheet (uploaded September 2024) lists CHI01 and CHI02 with capacity figures and shows CHI03 as arriving soon.
Power note
Sum of the three building figures on the operator's data sheet (24 MW CHI01, 7 MW CHI02, 22.4 MW CHI03); the sheet does not give a campus total.
Evidence
News reports; primary records not yet obtained
Size class
50 MW or more (tracker scope)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.