DataBank announced it had acquired the MSP2 building at 3255 Neil Armstrong Blvd., which it had leased. (DataBank, Oct. 1, 2026)
DCD reported DataBank would buy the 1998 building, once used by Taystee Foods, from Mapletree Industrial Trust for about $9.81 million under an option in its lease. (DatacenterDynamics, Sept. 30, 2026)
DCD described MSP2 in Eagan as the larger of DataBank's two original Minneapolis-area sites, which together have about 106,000 sq ft. (DatacenterDynamics, Nov. 4, 2021)
DCD reported that a Mapletree affiliate bought the DataBank-operated Eagan building, about 88,000 sq ft, for $9 million. (DatacenterDynamics, Aug. 2, 2021)
Conflicts and open questions
- The Star Tribune article on the Eagan project shows no date on the page that was opened, so it is cited only for the address, investment and incentives.
- Building size: 87,400 sq ft (DCD 2026) or 88,000 sq ft (DCD 2021). Power: DCD reported 20 MW of capacity in 2021 and said in 2026 the site launched with 5 MW in 2015; no current MW figure is set.
- DCD (Sept. 2026) reported the purchase as DataBank exercising a lease option for about $9.81 million, with closing expected in Q4 2026; DataBank's Oct. 1 release says it has acquired the building.
The full record
- Status note
- DataBank said on Oct. 1, 2026 that it had bought the MSP2 building it previously leased, describing the site as its second major Minneapolis interconnection hub.
- Evidence
- Primary public records
- Size class
- Under 50 MW (outside main scope; kept for completeness)