Data center project · Merrimack County, New Hampshire

Locke Road micro data center (East Concord)

Proposed · A small immersion-cooled data center with an office, garage and caretaker unit proposed for an industrially zoned East Concord parcel, which city staff classified as a permitted use. Also known as: 52 Locke Road.

← New Hampshire data centers
Belknap CountyCarroll CountyCheshire CountyCoos CountyGrafton CountyHillsborough CountyMerrimack CountyRockingham CountyStrafford CountySullivan CountyLocke Road micro data center (East Concord) · Proposed · 15 MW
Status
Proposed · as of Oct. 19, 2026
Location
52 Locke Road, East Concord · Merrimack County
Status note
Under 50 MW. A major site plan is before the Concord Planning Board, with a public hearing set for Oct. 21, 2026, as of Oct. 19 reporting.
Power
15 MW
Under 50 MW. Levitate says it sizes its micro data centers, including this design, at 15 MW of energy use; the figure is a company class size, not a site-specific utility or city filing.
Floor area
8,160 sq ft
Land
21 acres
Developer and team
Granite Municipal Manufacturing & Sales, LLC (landowner); Northpoint Engineering, LLC (applicant's engineer); Levitate Inc. (design and cooling technology)
End user
Not identified
Water
Single-phase immersion cooling in a closed loop; a 4-inch municipal water line (cut from 6 inches) is for fire suppression and limited domestic use, not server cooling, per the engineer.
Evidence
News reports; primary records not yet obtained
Size class
Under 50 MW (outside main scope; kept for completeness)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.

Updates, newest first

  1. Oct. 19, 2026 Levitate's CEO described the site as one of three similar pilots and said he hoped to start building by year's end; the Conservation Commission had reviewed a permit to replant about an acre of wetland buffer cleared in 2025. (Concord Monitor, Oct. 19, 2026)
  2. Sept. 16, 2026 The Planning Board was scheduled to rule on whether the application was complete; staff recommended finding it complete and not of regional impact. (Concord Monitor, Sept. 14, 2026)
  3. Sept. 14, 2026 The Monitor reported a major site plan for an 8,160-square-foot building, about 7,220 square feet of it data center space, on a nearly 21-acre lot with about 9.3 buildable acres; an earlier self-storage plan for the lot had been withdrawn in July. (Concord Monitor, Sept. 14, 2026)
  4. June 2026 City Planner Kellie Caron classified the micro data center as comparable to computer processing, a use allowed in the industrial district, so no variance was required. (Concord Monitor, Oct. 19, 2026)

Conflicts and open questions

  • The 15 MW figure is the company's class size for its micro data centers, not a figure from a utility or city filing.

Have records about this project? Send them to tips@signaldata.org.