Data center project · Rockingham County, New Hampshire
Nottingham Business Park data center (Old Turnpike Road)
Withdrawn · A local businessman floated a speculative data center on his Route 4 property, including an existing warehouse, then withdrew it hours before a packed planning board meeting.
- Status
- Withdrawn · as of May 27, 2026
- Location
- Old Turnpike Road (Route 4), Nottingham · Rockingham County
- Status note
- Pulled before a planning board concept discussion; the owner said he might revisit it later. The town then adopted a 12-month moratorium.
- Power
- Not reported
No power figure was reported. - Land
- 150 acres
- Investment
- The owner said site work for a future tenant would cost tens of millions of dollars.
- Developer and team
- Nottingham Business Park, LLC (Thomas Moulton)
- End user
- None; the owner said he had no tenant lined up
- Water
- The owner told the Union Leader that on-site water would circulate in a closed-loop system (as relayed by WZID).
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Sept. 8, 2026 Voters approved a 12-month data center moratorium, 1,335 to 143. (New Hampshire Public Radio (via Vermont Public), Sept. 9, 2026)
- June 29, 2026 NHPR, citing the Portsmouth Herald, reported the owner was considering bringing the plan back. (New Hampshire Public Radio, July 3, 2026)
- May 27, 2026 Hours before the meeting, Nottingham Business Park, LLC withdrew the item, saying it might return later with more information; residents still filled the gym, with 244 signed up to speak. (NBC Boston, May 27, 2026; New Hampshire Public Radio, June 4, 2026; New England News Collaborative (NHPR), Oct. 20, 2026)
- May 26, 2026 WZID reported the planning board would hear the conceptual presentation at the elementary school gym, moved there for an expected crowd. (WZID 95.7 FM, May 26, 2026; NBC Boston, May 27, 2026)
- May 20, 2026 InDepthNH reported Thomas Moulton would bring a concept for a data center on his Old Turnpike Road land to the planning board, with no tenant and no formal application. (InDepthNH.org, May 20, 2026)
Conflicts and open questions
- Acreage differs by source: InDepthNH reported a 100-plus acre property with 60-70 usable acres and about 40 acres for the data center; WZID reported about 150 acres with about 80 usable. Range 100-150 acres; upper value stored.
- The New England News Collaborative and NH Business Review describe an existing 200,000-square-foot warehouse on the property that the owner wanted to convert; whether the 40-acre figure includes it is not clear.
- No application was ever filed with the town.