Data center project · Washington County, Oregon
STACK Infrastructure POR03 campus, Hillsboro
Operating · STACK's eight-building, 200 MW campus in Hillsboro, plus a separate small POR01 site whose entitlement revision was filed just before the city's moratorium.
- Status
- Operating · as of Oct. 2026
- Location
- Hillsboro, near PGE's Shute Substation · Washington County
- Status note
- STACK's campus page lists 72 MW of operating critical capacity, 25 MW with near-term availability and 96 MW of expansion capacity (POR03E/F).
- Power
- 200 MW
STACK's stated total critical capacity for the campus at full build-out. - Floor area
- 1,600,000 sq ft
- Land
- 55 acres
- Developer and team
- STACK Infrastructure
- Utility
- Portland General Electric
- Water
- STACK says the campus uses closed-loop water cooling with air-cooled chillers.
- Incentives
- An applicant named SI POR03E filed one of the 17 Hillsboro enterprise zone applications now in court; its tie to STACK is not confirmed, and amounts were not reported.
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Oct. 21, 2026 STACK's campus page listed four POR03 buildings of 24 to 25 MW each and a planned 96 MW POR03E/F building. (STACK Infrastructure, Oct. 21, 2026)
- Aug. 12, 2026 DCD reported that STACK, hours before the moratorium, had filed a development review to revise entitlements at POR01, a 4 MW site near the POR02 and POR03 campus, which the city listed as in review. (DatacenterDynamics, Aug. 12, 2026)
- June 23, 2026 OPB listed an applicant named SI POR03E among the companies whose Hillsboro enterprise zone approvals were challenged in court; whether it is tied to STACK was not stated. (OPB, June 23, 2026)
- Oct. 2024 STACK's campus brochure described POR03 as 200 MW on 55 acres, master-planned for eight data centers totaling 1.6 million square feet. (STACK Infrastructure, Oct. 2024)
Conflicts and open questions
- The brochure and campus page are the operator's own marketing material, not public records.
- An enterprise zone applicant named SI POR03E is listed in the court challenge, and STACK's campus page lists a planned POR03E/F building; no source reviewed states that SI POR03E is a STACK entity, so the tie is not confirmed.