Data center project · Grant County, Washington
Vantage Data Centers Quincy campus (WA1)
Operating · Vantage's 68-acre, three-building Quincy campus. A plan for a gas power plant to serve it was dropped in July 2026. Also known as: WA1, WA11.
- Status
- Operating · as of July 30, 2026
- Location
- Quincy · Grant County
- Power
- 89 MW
Critical IT load across three buildings, as stated by Vantage. - Floor area
- 775,000 sq ft
- Land
- 68 acres
- Developer and team
- Vantage Data Centers
- Utility
- Grant County PUD
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Oct. 21, 2026 Vantage's campus page lists three data centers totaling 775,000 square feet and 89 MW of critical IT load on 68 acres, powered by Grant PUD. (Vantage Data Centers, Oct. 21, 2026)
- July 30, 2026 KUOW reported that VoltaGrid dropped a 14-generator gas power plant planned on Grant PUD land to serve the Vantage campus. Activists had gathered more than 500 opposing comments, and VoltaGrid withdrew its Ecology air permit application before the comment period closed; Grant PUD said on-site generation was no longer needed there. (KUOW, July 30, 2026)
Conflicts and open questions
- Neither Vantage nor VoltaGrid explained the reversal to KUOW. No power figure for the gas plant was found in opened sources.
Have records about this project? Send them to tips@signaldata.org.