Data center project · Santa Clara County, California
NorthTown Data Center (Goodman Innovation Centre San Jose)
Proposed · A two-building data center campus in North San José whose backup generators are under CEC review. Also known as: CP23-013.
- Status
- Proposed · as of July 21, 2026
- Location
- 350 and 370 West Trimble Road at Orchard Parkway, San José · Santa Clara County
- Power
- 97.3 MW
97.3 MW of backup generation per the CEC. - Floor area
- 414,000 sq ft
- Land
- 28.5 acres
- Developer and team
- GIC San Jose, LLC
- Utility
- PG&E
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- July 21, 2026 The CEC issued a notice that it will prepare an environmental impact report for 42 diesel backup generators (25-SPPE-02). (Governor's Office of Land Use and Climate Innovation, CEQAnet, July 21, 2026; California Energy Commission, undated)
- Nov. 1, 2025 Baxtel reported Goodman had bought the site and planned two buildings totaling 414,000 sq ft with up to 97.3 MW by 2028. (Baxtel, Nov. 1, 2025)
- June 30, 2025 An application for an 81-foot data center of about 206,000 sq ft at 350 W. Trimble was filed with the city (CP23-013). (City of San José, Planning Division, undated)
Conflicts and open questions
- Square footage differs: about 206,250 sq ft on the city list, 414,000 sq ft per Baxtel (possibly two phases). Site acreage: 28.5 (CEC) vs. 45.8 for the whole property (Baxtel).
- That GIC San Jose LLC is Goodman's entity is inferred from Baxtel's report and a shared contact with GIC Vernon LLC, not confirmed.