Data center project · Santa Clara County, California

NorthTown Data Center (Goodman Innovation Centre San Jose)

Proposed · A two-building data center campus in North San José whose backup generators are under CEC review. Also known as: CP23-013.

← California data centers
Alameda CountyAlpine CountyAmador CountyButte CountyCalaveras CountyColusa CountyContra Costa CountyDel Norte CountyEl Dorado CountyFresno CountyGlenn CountyHumboldt CountyImperial CountyInyo CountyKern CountyKings CountyLake CountyLassen CountyLos Angeles CountyMadera CountyMarin CountyMariposa CountyMendocino CountyMerced CountyModoc CountyMono CountyMonterey CountyNapa CountyNevada CountyOrange CountyPlacer CountyPlumas CountyRiverside CountySacramento CountySan Benito CountySan Bernardino CountySan Diego CountySan Francisco CountySan Joaquin CountySan Luis Obispo CountySan Mateo CountySanta Barbara CountySanta Clara CountySanta Cruz CountyShasta CountySierra CountySiskiyou CountySolano CountySonoma CountyStanislaus CountySutter CountyTehama CountyTrinity CountyTulare CountyTuolumne CountyVentura CountyYolo CountyYuba CountyNorthTown Data Center (Goodman Innovation Centre San Jose) · Proposed · 97.3 MW
Status
Proposed · as of July 21, 2026
Location
350 and 370 West Trimble Road at Orchard Parkway, San José · Santa Clara County
Power
97.3 MW
97.3 MW of backup generation per the CEC.
Floor area
414,000 sq ft
Land
28.5 acres
Developer and team
GIC San Jose, LLC
Utility
PG&E
Evidence
Primary public records
Size class
50 MW or more (tracker scope)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.

Updates, newest first

  1. July 21, 2026 The CEC issued a notice that it will prepare an environmental impact report for 42 diesel backup generators (25-SPPE-02). (Governor's Office of Land Use and Climate Innovation, CEQAnet, July 21, 2026; California Energy Commission, undated)
  2. Nov. 1, 2025 Baxtel reported Goodman had bought the site and planned two buildings totaling 414,000 sq ft with up to 97.3 MW by 2028. (Baxtel, Nov. 1, 2025)
  3. June 30, 2025 An application for an 81-foot data center of about 206,000 sq ft at 350 W. Trimble was filed with the city (CP23-013). (City of San José, Planning Division, undated)

Conflicts and open questions

  • Square footage differs: about 206,250 sq ft on the city list, 414,000 sq ft per Baxtel (possibly two phases). Site acreage: 28.5 (CEC) vs. 45.8 for the whole property (Baxtel).
  • That GIC San Jose LLC is Goodman's entity is inferred from Baxtel's report and a shared contact with GIC Vernon LLC, not confirmed.