Data center campus · 22 Linnell Circle, Billerica, MA 01821, Middlesex County, Massachusetts

EdgeConneX BOS01 (Billerica)

Operating as of March 2026

EdgeConneX runs its BOS01 edge data center, a 54,700 sq ft building with 1.5 MW of power, at 22 Linnell Circle in Billerica. Also known as: EdgeConneX Boston Edge Data Center.

Cite← Massachusetts data centers
Barnstable CountyBerkshire CountyBristol CountyDukes CountyEssex CountyFranklin CountyHampden CountyHampshire CountyMiddlesex CountyNantucket CountyNorfolk CountyPlymouth CountySuffolk CountyWorcester CountyEdgeConneX BOS01 (Billerica) · Operating · 1.5 MW
Power1.5MW reported · stated
Floor area54,700sq ft

Who is behind it

ProjectEdgeConneX BOS01 (Billerica)Also: EdgeConneX Boston Edge Data Center
Developer and teamEdgeConneX
End userNot found in the recordsNot yet named in any record or credited report we have found.

The record, newest first

  1. An updated EdgeConneX data sheet still lists BOS01 at 1.5 MW with a plan for 4.5 MW. (EdgeConneX, March 2026)

  2. EdgeConneX's Boston data sheet places BOS01 at 22 Linnell Circle in Billerica, with 21,400 sq ft of raised floor. (EdgeConneX, Sept. 2024)

Conflicts and open questions

  • Address from the 2024 data sheet; the 2026 update gives no street address. Coordinates approximate.
  • Status date is the March 2026 data sheet, the latest dated operator record found.

The full record

Power note
EdgeConneX states 1.5 MW (N+1) with plans for 4.5 MW.
Evidence
Primary public records
Size class
Under 50 MW (outside main scope; kept for completeness)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.