Coal Creek Station on-site crypto mining (Adakon Energy Solutions)
An interruptible, behind-the-meter bitcoin/crypto mining load of about 225 MW run by Adakon Energy Solutions at Rainbow Energy's Coal Creek lignite plant, plus a small Rainbow-owned mining operation. Also known as: Rainbow Energy Center data load.
Who is behind it
Rainbow Energy Center (through Rainbow Energy Center, LLC)
The record, newest first
The Minot Daily News, reporting a Rainbow talk, described Adakon as a 225 MW crypto mining operation that can ride through power interruptions, which Rainbow said lets Coal Creek run at full output whatever the market demand. (Minot Daily News, April 15, 2026)
Rainbow listed Adakon Energy Solutions as an interruptible, behind-the-meter crypto mining customer of 225 MW and its own mining at 4 MW, and showed two planned data expansions of 285 MW and 130 MW to be served by Coal Creek through the Rainbow substation. (Rainbow Energy Center (to ND Legislative Management, Energy Development and Transmission Committee), Nov. 6, 2025)
Data Center Dynamics reported that a 200 MW data center already ran on the plant site, powered directly by Coal Creek. (Data Center Dynamics, July 8, 2025)
Conflicts and open questions
- Coordinates approximate, placed at Coal Creek Station.
- Whether the planned 285 MW and 130 MW expansions sit on the plant site or in the adjoining Rainbow Energy Park was not stated; they are noted here because Rainbow listed them with the plant's own loads.
- Start date of the Adakon operation not found in a record opened.
The full record
- Power note
- Rainbow's November 2025 presentation and April 2026 reporting give 225 MW for Adakon; July 2025 reporting described an existing 200 MW data center at the plant. Rainbow listed its own 4 MW mining operation separately.
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)