Data center project · Storey County, Nevada
EdgeCore Reno campus
Under construction · EdgeCore's two-building campus in the industrial center, under construction since 2023 with an on-site substation due in 2025.
- Status
- Under construction · as of Aug. 2023
- Location
- Tahoe-Reno Industrial Center · Storey County
- Power
- 216 MW
Critical IT load of the first two buildings as stated by EdgeCore. - Floor area
- 1,500,000 sq ft
- Developer and team
- EdgeCore Digital Infrastructure
- Utility
- NV Energy (on-site substation)
- Water
- Closed-loop chilled water system, per EdgeCore.
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Aug. 23, 2023 The Fernley Reporter reported EdgeCore had started work on a substation and two buildings of 1.5 million square feet in all, sized for 216 MW of IT load. (The Fernley Reporter, Aug. 23, 2023)
Conflicts and open questions
- No later public record of the campus status was found; it may now be operating.
Have records about this project? Send them to tips@signaldata.org.