AWS Hilliard Scioto Darby Road data center campus
Amazon's third Hilliard campus, approved in 2022 for seven data center buildings beside I-270, is in operation and is slated to get a 228-unit natural gas fuel cell plant from AEP Ohio, whose air permit the city appealed and later stopped contesting. Also known as: AWS third Hilliard campus, Scioto Darby Creek Road campus.
Who is behind it
The record, newest first
Hilliard withdraws its permit appeal, saying the legal grounds were narrow, and plans air testing once the fuel cells run. (City of Hilliard, Sept. 15, 2026)
Ohio EPA holds a public meeting on a draft air permit allowing up to 158 emergency generators at the campus; an agency official tells NBC4 the facility is in operation. (WWHO CW Columbus, March 19, 2026; NBC4 WCMH-TV, March 20, 2026)
Signal Cleveland describes the 142-acre campus as built and operating and reports the city is appealing the fuel cell air permit. (Signal Cleveland, Feb. 10, 2026)
Hilliard files an appeal of the Ohio EPA air permit for the fuel cells with the Environmental Review Appeals Commission, following an Oct. 27 council vote. (City of Hilliard, Oct. 31, 2025)
City says state law leaves it no review over the fuel cells after AEP pulls its local application; AWS withdraws a related site plan change. (City of Hilliard, Oct. 21, 2025)
Ohio Power Siting Board approval takes effect for AEP Ohio's 72.9 MW, 228-unit Bloom Energy fuel cell plant on about 6.4 acres of the campus. (City of Hilliard, Oct. 21, 2025; City of Hilliard, May 27, 2026; AEP Ohio, undated)
Construction is reported underway on the site. (The Hilliard Beacon, April 23, 2023)
The Planning and Zoning Commission approves the site plan 4-3 for seven data center buildings and a security and utility building; the zoning appeals board later grants height and fence variances. (The Hilliard Beacon, April 23, 2023)
Hilliard's economic development director says Amazon plans to begin building on about 151 acres at 4120 Scioto Darby Road near I-270. (Columbus Business First (via NBC4), May 19, 2022)
Conflicts and open questions
- Coordinates from a Census geocode of 4120 Scioto Darby (Creek) Road.
- Records use both 'Scioto Darby Road' (city planning) and 'Scioto Darby Creek Road' (AEP, city fuel cell page).
- Acreage: 151-152 acres in 2022-23 reports; city and Signal give 142 acres in 2025-26. Used 142.
- AEP's project page lists construction from early fall 2026 to early fall 2027; the city's FAQ page said a January 2026 start.
- The 72.9 MW OPSB case number (25-0649-EL-BLN) is from AEP's project page.
The full record
- Status note
- NBC4 (March 2026) quotes an Ohio EPA official saying the facility is in operation, and Signal Cleveland (Feb. 2026) describes the 142-acre campus as built and operating. A 72.9 MW AEP Ohio fuel cell plant for the campus is planned; Hilliard dropped its permit appeal Sept. 15, 2026.
- Power note
- 72.9 MW is the AEP Ohio on-site fuel cell plant serving the campus (OPSB case 25-0649-EL-BLN), not the campus IT load.
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)