Data center campus · Camp Hall commerce park, near Ridgeville (SC Hwy 27), Berkeley County, South Carolina

DC BLOX Charleston North (Camp Hall)

Proposed as of Jan. 2025

DC BLOX, which bought 27.5 acres from Santee Cooper at Camp Hall in 2023 for a 45 MW data center, later moved to a larger 64.5-acre parcel there and now markets a three-building hyperscale campus. Also known as: CHS1.

Cite← South Carolina data centers
Abbeville CountyAiken CountyAllendale CountyAnderson CountyBamberg CountyBarnwell CountyBeaufort CountyBerkeley CountyCalhoun CountyCharleston CountyCherokee CountyChester CountyChesterfield CountyClarendon CountyColleton CountyDarlington CountyDillon CountyDorchester CountyEdgefield CountyFairfield CountyFlorence CountyGeorgetown CountyGreenville CountyGreenwood CountyHampton CountyHorry CountyJasper CountyKershaw CountyLancaster CountyLaurens CountyLee CountyLexington CountyMarion CountyMarlboro CountyMcCormick CountyNewberry CountyOconee CountyOrangeburg CountyPickens CountyRichland CountySaluda CountySpartanburg CountySumter CountyUnion CountyWilliamsburg CountyYork CountyDC BLOX Charleston North (Camp Hall) · Proposed · 270 MW
Power270MW reported · stated
Floor area1.131e+06sq ft
Site64.5acres
IT load180MW

Who is behind it

ProjectDC BLOX Charleston North (Camp Hall)Also: CHS1
Developer and teamDC BLOX
End userNot found in the recordsNot yet named in any record or credited report we have found.

The record, newest first

  1. DC BLOX listed Charleston North at Camp Hall as a 64.4-acre hyperscale campus in planning, served by Santee Cooper. (DC BLOX, Jan. 2025; DC BLOX, undated)

  2. Reporting said Santee Cooper's board had discussed selling DC BLOX a 64.5-acre Camp Hall parcel for about $17.7 million, with DC BLOX returning its original 27.5 acres; the Joint Bond Review Committee had to approve the sale. The plan called for three 150,000 sq ft buildings and an onsite substation. (Post and Courier, Jan. 27, 2024)

  3. DC BLOX said it had bought 27.5 acres from Santee Cooper at Camp Hall and secured power for a planned 45 MW, four-building data center of about 200,000 sq ft. (DC BLOX (Business Wire), Sept. 27, 2023; American Public Power Association, Oct. 23, 2023)

Conflicts and open questions

  • No record was found confirming that the 64.5-acre sale closed or that the Joint Bond Review Committee approved it.
  • Building sizes differ between the 2024 reported plan (three 150,000 sq ft buildings) and later company material (about 1.13 million sq ft).
  • Coordinates approximate, Camp Hall commerce park area.

The full record

Status note
DC BLOX lists the campus as in planning; no construction start was found.
Power note
DC BLOX marketing material lists 270 MW for the campus with 180 MW critical load; a January 2025 brochure lists 200 MW critical and 300 MW gross; the original 2023 plan was 45 MW.
Evidence
Primary public records
Size class
50 MW or more (tracker scope)