Data center project · Culpeper, Virginia
Copper Ridge data center campus
Approved · A 2.2 million sq ft, 600 MW campus approved inside the Town of Culpeper beside the national cemetery, whose substation has been disputed.
- Status
- Approved · as of Sept. 2023
- Location
- Off East Chandler Street in the Town of Culpeper, next to Culpeper National Cemetery and near East Davis Street · Culpeper
- Status note
- Rezoned by the town council in 2023; in June 2024 the town planning commission found its substation site did not conform to the comprehensive plan.
- Power
- 600 MW
Planned load as reported by InsideNoVa/Culpeper Times (Aug. 2024); no county or utility record of the figure was opened. - Floor area
- 2,200,000 sq ft
- Land
- 116 acres
- Developer and team
- CR1/Culpeper LLC and CR2/Culpeper (landowners)
- Utility
- Dominion Energy
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Sept. 2025 Dominion proposed a $253.7 million transmission upgrade in Culpeper, Orange and Fauquier counties mainly to serve Databank, Copper Ridge and the Culpeper Technology Campus. (Piedmont Environmental Council, Sept. 17, 2025)
- Aug. 15, 2024 Local reporting listed Copper Ridge, on more than 115 acres next to the Culpeper Technology Campus, with a planned 600 MW load. (InsideNoVa / Culpeper Times, Aug. 15, 2024)
- June 18, 2024 In a required review, the town planning commission found the Copper Ridge substation location inconsistent with the comprehensive plan. (InsideNoVa / Culpeper Times, June 25, 2024; Piedmont Environmental Council, June 24, 2024)
- Sept. 12, 2023 The town council approved the rezoning from residential to industrial 6-0, with one abstention and one member absent. (InsideNoVa / Culpeper Times, Sept. 14, 2023; Piedmont Environmental Council, June 24, 2024)
- Aug. 15, 2023 The town planning commission split 2-2 and sent the rezoning to council without a recommendation. (Piedmont Environmental Council, Aug. 31, 2023)
Conflicts and open questions
- Square footage is reported as about 1.99 million (InsideNoVa, 2023, five buildings) and 2.2 million (PEC). Acreage is reported as about 115 and 116.
- What the town council did after the June 2024 substation finding was not confirmed.
Have records about this project? Send them to tips@signaldata.org.