Data center project · Spotsylvania, Virginia
Crossroads Technology Campus
Proposed · An Amazon data center campus on 555 acres, cut from 15 buildings to seven, that the Spotsylvania planning commission recommended in September 2026.
- Status
- Proposed · as of Sept. 16, 2026
- Location
- North of Eagle Drive, Lee Hill School Drive and Mills Drive (U.S. 17), west of the CSX line, Lee Hill District · Spotsylvania
- Status note
- The planning commission recommended a special use permit 4-2; supervisors decide.
- Power
- 894 MW
Estimated electric load in REC's utility information form; REC says the figure came from the applicant and was not independently verified. - Land
- 555 acres
- Developer and team
- RCK Digital Crossroads (initial applicant)
- End user
- Amazon Web Services
- Utility
- Rappahannock Electric Cooperative (three new 230/34.5 kV substations); Dominion Energy is the transmission provider
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Sept. 16, 2026 The planning commission voted 4-2 that the project fits the comprehensive plan and 4-2 to recommend the permit, with about 60 conditions including 300-foot buffers and 63% open space. (Fredericksburg Free Press, Sept. 17, 2026)
- Aug. 7, 2026 In a form filed with the county under Va. Code § 15.2-2209.5(C), Rappahannock Electric Cooperative put the estimated load at 894 MW, to be served by three new 230/34.5 kV substations with Dominion as the transmission provider. (Rappahannock Electric Cooperative (posted by Spotsylvania County), Aug. 7, 2026)
- May 2025 The project was first proposed with 15 buildings. (Fredericksburg Free Press, Sept. 17, 2026)
Have records about this project? Send them to tips@signaldata.org.