LS Power data center plan, Old Ridge Road
Withdrawn · LS Power withdrew a rezoning for three or four data center buildings on 200 acres across the road from the Doswell gas plant it used to own.
- Status
- Withdrawn · as of May 2026
- Location
- 10165 Old Ridge Road, near Kings Dominion and Doswell · Hanover
- Power
- 300 MW
Power LS Power told FERC it would sell to the planned behind-the-meter data center from two gas units at its Doswell plant; no separate campus load was reported. - Land
- 200 acres
- Developer and team
- LS Power
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- May 2026 The developer's attorney told the county it was withdrawing the zoning request. (Richmond BizSense, June 26, 2026)
- March 2026 LS Power filed with federal regulators to sell about 300 MW from two gas-fired units at its Doswell plant to a planned behind-the-meter data center on the 205-acre site. (DatacenterDynamics, March 13, 2026)
Have records about this project? Send them to tips@signaldata.org.