Data center project · Culpeper, Virginia
XX Tech Park
Proposed · A 426-acre, roughly 4.6 million sq ft campus proposed in rural Brandy Station that would need three substations and new transmission lines.
- Status
- Proposed · as of Aug. 15, 2024
- Location
- Brandy Station, less than a mile from Culpeper Battlefields State Park · Culpeper
- Status note
- The county planning commission unanimously recommended denial; a supervisors' hearing was set for Aug. 6, 2024, but no record or report of a board vote or withdrawal was found. The latest report (Aug. 15, 2024) still listed it as pending.
- Power
- 900 MW
InsideNoVa reported a proposed 900 MW load. PEC, an opponent, estimated 700 MW to 1.8 GW; that estimate is not used here. - Floor area
- 4,600,000 sq ft
- Land
- 426 acres
- Developer and team
- Culpeper Acquisitions LLC
- Utility
- Dominion Energy
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)
Updates, newest first
- Aug. 15, 2024 Local reporting still listed the application as pending and gave its proposed load as 900 MW. (InsideNoVa / Culpeper Times, Aug. 15, 2024)
- June 12, 2024 The county planning commission voted unanimously to recommend denial. (Piedmont Environmental Council, June 24, 2024)
- May 30, 2024 PEC reported the application, from the same developer behind a 2022 Brandy Station proposal that was withdrawn. (Piedmont Environmental Council, May 30, 2024)
Conflicts and open questions
- Whether supervisors voted on the application, or it was withdrawn, was not confirmed.
- Square footage is given as 4.5 million (InsideNoVa) and 4.6 million (PEC).
Have records about this project? Send them to tips@signaldata.org.