Data center campus · 375 Riverside Parkway, Lithia Springs, Douglas County, Georgia
Centersquare Lithia Springs ATL1
Operating
as of Oct. 30, 2026
An operating Centersquare colocation facility on Riverside Parkway in Lithia Springs with 81.5 MW of utility power. Also known as: 375 Riverside Parkway.
Power81.5MW reported · stated
Floor area102,421sq ft
Who is behind it
ProjectCentersquare Lithia Springs ATL1Also: 375 Riverside Parkway
Developer and teamCentersquare
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
Centersquare lists Lithia Springs ATL1 with 81.5 MW of utility power and about 102,000 sq ft of raised floor. (Centersquare (Csquare), Oct. 30, 2026; datacenterHawk, Oct. 30, 2026)
Conflicts and open questions
- datacenterHawk lists the facility as commissioned in a 137,203 sq ft retrofit building; the sqft field uses the operator's raised-floor figure.
The full record
- Power note
- Utility power figure from the operator page, not IT load.
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)