Data center campus · Glenwood Springs Road, unincorporated Putnam County near Eatonton, Putnam County, Georgia
Eatonton 379 data center campus
Proposed
as of Oct. 26, 2026
An 11-building, roughly 3.5 million sq ft, 520 MW data center campus proposed on about 543 acres near Eatonton while Putnam County has a data center moratorium in place.
Power520MW reported · record
Floor area3,510,000sq ft
Site543acres
Who is behind it
ProjectEatonton 379 data center campus
Developer and teamEatonton 379, LLC
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
Trade press reported the developer's targeted 2031 completion and that Putnam had extended its moratorium on data centers, battery storage and solar through Nov. 17, 2026. (Construction Review Online, Oct. 28, 2026)
A DRI was submitted for about 11 data center buildings totaling roughly 3.5 million sq ft on about 543 acres, with an estimated peak load of about 520 MW and completion by 2031. (Georgia Department of Community Affairs, Oct. 26, 2026; Georgia Department of Community Affairs, Oct. 26, 2026; Georgia Department of Community Affairs, Oct. 30, 2026)
Conflicts and open questions
- DRI lists the site as about 543 acres; Construction Review Online says about 542 acres.
- No operator or end user is named in the filing.
- The DRI form names the City of Eatonton as the submitting government, while the state DRI list shows the site as unincorporated Putnam County.
- Floor area: 3,510,000 sq ft (project size field) versus 3,501,600 sq ft (description) in the DRI.
- Listed property owners include private individuals; not named here.
The full record
- Status note
- DRI filed Oct. 26, 2026; rezoning and a conditional use are requested while Putnam's data center moratorium and draft ordinance are pending.
- Power note
- Estimated peak connected load stated in the DRI (about 520 MW).
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)