Data center campus · 808 Factory Shoals Road, Lithia Springs, Douglas County, Georgia
STACK ATL02 Lithia Springs campus
Proposed
as of Dec. 11, 2023
A STACK Infrastructure campus of up to 160 MW on 64 acres off Factory Shoals Road, first filed as two three-story buildings in a 2023 regional-impact review.
Power160MW reported · stated
Floor area879,000sq ft
Site64acres
Who is behind it
ProjectSTACK ATL02 Lithia Springs campus
Developer and teamSTACK Infrastructure (through SI ATL02A, LLC)
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
STACK's ATL02 page lists a 160 MW, 64-acre campus in Lithia Springs. (STACK Infrastructure, Oct. 30, 2026)
The Atlanta Regional Commission issued its finding, closing the regional review. (Georgia Department of Community Affairs, Oct. 30, 2026)
STACK, through an entity named SI ATL02A, filed a regional-impact review (DRI 4087) for two three-story data centers totaling about 879,000 sq ft and valued at $380.9 million, with completion listed for May 2026. (Bisnow, Oct. 16, 2023; Georgia Department of Community Affairs, Oct. 30, 2026; Georgia Department of Community Affairs, Oct. 30, 2026)
Conflicts and open questions
- DCD later reported a second DRI filing for two more two-story buildings (about 196,000 and 227,000 sq ft); that page showed no date and is not cited.
- A tracker lists the first two buildings as under construction for 2027; not confirmed in a citable source, so status stays at the 2023 filing.
- Newer construction news could not be searched (search limit reached during verification); status left at proposed.
The full record
- Status note
- Regional review finished in December 2023; no construction start confirmed in an opened record.
- Power note
- The STACK page states 160 MW for the campus; an earlier listing cited by Bisnow gave 48 MW on 39 acres.
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)