Data center campus · 1456 Trae Lane, Lithia Springs, Douglas County, Georgia
T5@Atlanta campus
Operating
as of Oct. 3, 2023
T5 Data Centers' 80-acre Lithia Springs campus, planned for about 220 MW across five buildings, which the AJC described as operating in 2023. Also known as: T5@Atlanta III.
Power220MW reported · stated
Site80acres
Who is behind it
ProjectT5@Atlanta campusAlso: T5@Atlanta III
Developer and teamT5 Data Centers
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
A colocation directory lists a 66 MW, 476,000 sq ft building at 1456 Trae Lane on the 80-acre campus. (Ocolo, Oct. 30, 2026)
The AJC noted that T5 already operates a data center campus in Douglas County. (The Atlanta Journal-Constitution, Oct. 3, 2023)
DCD described T5's existing 80-acre Trae Lane campus, started in 2018, as planned for 220 MW across five buildings. (DatacenterDynamics, Oct. 1, 2023)
Conflicts and open questions
- The DCD page showed no date; October 2023 is inferred from the AJC's same-week coverage of the T5 Coweta filing it reports.
- A directory lists one 66 MW, 476,000 sq ft building (Building 3) at the same address; how many of the five planned buildings are operating is not confirmed.
The full record
- Power note
- Full build-out figure reported by DCD; individual buildings of 20 to 66 MW.
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)