Data center campus · 35 Summit Park Drive, RIDC Park West, North Fayette Township, Allegheny County, Pennsylvania

DataBank PIT2, Summit Park campus (RIDC Park West)

Operating as of Oct. 31, 2026

DataBank's second Pittsburgh-area data center, a former PNC Bank facility in North Fayette Township, on a 17-acre campus DataBank says can hold more buildings. Also known as: Summit Park Data Center: PIT 2.

Cite← Pennsylvania data centers
Adams CountyAllegheny CountyArmstrong CountyBeaver CountyBedford CountyBerks CountyBlair CountyBradford CountyBucks CountyButler CountyCambria CountyCameron CountyCarbon CountyCentre CountyChester CountyClarion CountyClearfield CountyClinton CountyColumbia CountyCrawford CountyCumberland CountyDauphin CountyDelaware CountyElk CountyErie CountyFayette CountyForest CountyFranklin CountyFulton CountyGreene CountyHuntingdon CountyIndiana CountyJefferson CountyJuniata CountyLackawanna CountyLancaster CountyLawrence CountyLebanon CountyLehigh CountyLuzerne CountyLycoming CountyMcKean CountyMercer CountyMifflin CountyMonroe CountyMontgomery CountyMontour CountyNorthampton CountyNorthumberland CountyPerry CountyPhiladelphia CountyPike CountyPotter CountySchuylkill CountySnyder CountySomerset CountySullivan CountySusquehanna CountyTioga CountyUnion CountyVenango CountyWarren CountyWashington CountyWayne CountyWestmoreland CountyWyoming CountyYork CountyDataBank PIT2, Summit Park campus (RIDC Park West) · Operating · 5 MW
Power5MW reported · stated
Floor area47,100sq ft
Site17acres
IT load5MW

Who is behind it

ProjectDataBank PIT2, Summit Park campus (RIDC Park West)Also: Summit Park Data Center: PIT 2
Developer and teamDataBank
End userNot found in the recordsNot yet named in any record or credited report we have found.

The record, newest first

  1. DataBank's campus page lists PIT2 as the campus's only data center, with 47,100 square feet of IT space and 5 MW of critical IT load. (DataBank, Oct. 31, 2026; DataBank, Oct. 31, 2026)

  2. DataBank's opening of the site as its second Pittsburgh-area data center was reported, with 40,000 square feet of raised floor. (Area Development, June 26, 2020)

  3. DataBank bought the three-story building from PNC Bank, which stayed on as an anchor tenant under a long-term leaseback (as reported in 2020). (Area Development, June 26, 2020)

Conflicts and open questions

  • Municipality from Census geocoder at the OSM-mapped building point (North Fayette Township); DataBank uses a Pittsburgh 15275 mailing address.
  • Some third-party listings show a 'PIT3' at the same Summit Park address; DataBank's own pages list only PIT2, so no separate project.

The full record

Status note
Listed by DataBank as an operating facility on a 17-acre campus with room for more buildings.
Power note
5 MW critical IT load per DataBank; the campus page says the serving West Penn Power substation offers 8 MW. Area Development (2020) reported up to 4.55 MW at opening.
Evidence
Primary public records
Size class
Under 50 MW (outside main scope; kept for completeness)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.