Data center campus · 5700 N Blackstock Rd, Spartanburg, Spartanburg County, South Carolina
DartPoints Spartanburg (SPA01)
Operating
as of Oct. 24, 2026
A stand-alone colocation data center north of Spartanburg in a 21,400 sq ft building with a 7,000 sq ft data floor, acquired by DartPoints with Immedion in 2021. Also known as: Immedion Spartanburg.
Power1.5MW reported · record
Floor area21,400sq ft
IT load0.8MW
Who is behind it
ProjectDartPoints Spartanburg (SPA01)Also: Immedion Spartanburg
Developer and teamDartPoints
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
DartPoints lists SPA01 at 5700 N Blackstock Rd in a 21,400 sq ft building with a 7,000 sq ft data floor, 1.5 MW of utility power and 0.8 MW of critical IT load. (DartPoints, Oct. 24, 2026; DartPoints, Oct. 24, 2026)
DartPoints announced it would acquire Immedion, whose portfolio included a Spartanburg data center. (DartPoints (Business Wire), March 16, 2021)
Conflicts and open questions
- sqft is the whole building (21,400); the data floor is 7,000 sq ft.
- Coordinates approximate, from the street address.
The full record
- Status note
- Listed among DartPoints' South Carolina data centers on the company's site as of Oct. 24, 2026.
- Power note
- 1.5 MW of utility power per DartPoints; the company lists critical IT load as 0.8 MW.
- Evidence
- Primary public records
- Size class
- Under 50 MW (outside main scope; kept for completeness)