CyrusOne Fort Worth campus (DFW7 and DFW8)
CyrusOne's first Fort Worth campus, next to a battery storage site in northwest Fort Worth, planned for about 200 MW. Also known as: DFW7, DFW8.
Who is behind it
The record, newest first
Trade press reported the campus at 200 MW, sited beside Eolian's 100 MW Chisholm Grid battery storage facility and existing transmission. (Converge Digest, Jan. 13, 2026)
CyrusOne filed a $75 million tenant fit-out for DFW7 data halls. (Texas Department of Licensing and Regulation, July 31, 2025)
A second building, DFW8, was registered with the state at an estimated $275 million. (Texas Department of Licensing and Regulation, April 7, 2025)
CyrusOne broke ground on its first Fort Worth campus, a multi-building site with about 70 MW of initial IT capacity; an Oncor executive took part. (CyrusOne, April 4, 2025)
CyrusOne's entity registered DFW7, a $200 million single-story data center on Asphalt Drive, with the state. (Texas Department of Licensing and Regulation, Sept. 25, 2024)
Conflicts and open questions
- Coordinates are approximate for ZIP 76179 in northwest Fort Worth; no full street address was confirmed.
- The lead grouped these buildings with ACS's Hicks Field Road campus, a separate operator and site (see acs-hicks-field-fort-worth).
- The DFW7 filing lists 1,904,000 sq ft while its scope says about 190,400 sq ft; one figure is likely a typo.
- Converge Digest calls the 200 MW campus DFW7; the DFW8 filing lists about 83,000 sq ft and the address as TBD in ZIP 76179.
The full record
- Status note
- Initial capacity was scheduled to come online starting in 2026.
- Power note
- Campus total reported by Converge Digest; CyrusOne's groundbreaking release gives an initial IT capacity of about 70 MW.
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)