Data center campus · 8600 Harry Hines Boulevard, Dallas, Dallas County, Texas
DataBank DFW6 (Dallas Love Field)
Operating
as of Oct. 2026
A small DataBank colocation site near Love Field with about 0.7 MW of critical IT load. Also known as: DFW6.
PowerNot statedNot reported in the records found
Floor area12,560sq ft
IT load0.675MW
Who is behind it
ProjectDataBank DFW6 (Dallas Love Field)Also: DFW6
Developer and teamDataBank
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
DataBank lists DFW6 with 12,560 square feet of IT space and 0.675 MW of critical IT load. (DataBank, undated)
Conflicts and open questions
- 12,560 square feet is IT floor space; it_mw is the operator's stated critical IT load.
- The lead grouped this DataBank site with Digital Realty and Prime buildings; they are different operators and sites.
- Events dated 2026-10-29 reflect the date the undated operator page was checked.
The full record
- Evidence
- Primary public records
- Size class
- Under 50 MW (outside main scope; kept for completeness)