Data center campus · NW H K Dodgen Loop and Industrial Boulevard, Temple, Bell County, Texas
Meta Temple data center
Operating
as of July 22, 2026
Meta's Temple data center, redesigned for AI workloads after a construction pause, which began serving traffic in July 2026.
PowerNot statedNot reported in the records found
Floor area900,000sq ft
Site393acres
Who is behind it
ProjectMeta Temple data center
Developer and teamMeta
End userMeta
The record, newest first
Meta said the Temple data center was operating, with about 100 operations jobs and more than 760,000 square feet across two buildings. (KWTX, July 22, 2026; DatacenterDynamics, July 23, 2026)
Construction resumed on the redesigned facility. (DatacenterDynamics, July 23, 2026)
Work paused while Meta redesigned its data centers for AI workloads. (DatacenterDynamics, July 23, 2026)
Construction began in spring 2022. (DatacenterDynamics, July 23, 2026)
Conflicts and open questions
- Size reported as more than 760,000 sq ft in two buildings (KWTX) and about 900,000 sq ft at completion (DCD).
- Power capacity not stated in sources opened.
The full record
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)