Data center campus · 111 Customer Way, Irving (Las Colinas), Dallas County, Texas
PowerHouse Irving (Las Colinas)
Under construction
as of March 30, 2026
PowerHouse and Harrison Street are building three powered-shell data centers on a former distribution site in Las Colinas.
Power200MW reported · stated
Floor area946,000sq ft
Site50acres
Who is behind it
ProjectPowerHouse Irving (Las Colinas)
Developer and teamPowerHouse Data Centers (American Real Estate Partners)
Harrison Street
Harrison Street
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
Citing a PowerHouse LinkedIn post, Baxtel reports the first of three buildings has topped out, with interior work continuing. (Baxtel, March 30, 2026)
PowerHouse and Harrison Street buy a 50-acre site at 111 Customer Way and announce three powered-shell buildings totaling about 946,000 sq ft and 200 MW. (Dallas Innovates, May 15, 2024; Area Development, May 21, 2024)
Conflicts and open questions
- The TDLR record for the AREP Las Colinas filing (TABS2025013924) could not be opened, so it is not cited; evidence stays 'reported' until it is.
- The site was formerly a retailer's distribution warehouse.
- The topping-out report gives about 900,000 sq ft in three two-story buildings; the 2024 announcement gave 946,000 sq ft.
The full record
- Power note
- About 67 MW per building; a later report says up to 201 MW.
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)