Riot Platforms Corsicana campus
A 1 GW bitcoin mining site near Corsicana that Riot is converting in part into an AI and high-performance computing campus. Also known as: Project Ditto (first building).
Who is behind it
The record, newest first
Riot registered Project Ditto, a new 335,428-square-foot data center building at 6980 FM 709 estimated at $400 million, with the state, listing work from April 2026 to May 2028. (Texas Department of Licensing and Regulation, May 13, 2026)
Riot's first-quarter 2026 investor presentation said core-and-shell work on the first 168 MW building was under way and described a campus of up to 756 MW of IT capacity; no tenant was disclosed. (Riot Platforms (SEC Form 8-K, Exhibit 99.2), April 30, 2026; Riot Platforms, undated)
Riot energized the 400 MW substation at its Corsicana site, the first phase of a planned 1 GW facility on 265 acres. (Riot Platforms, April 18, 2024)
Conflicts and open questions
- Acreage is the 265 acres in Riot's 2024 release; no opened source gives a newer acreage.
- Coordinates are approximate, along FM 709 south of Corsicana.
- Riot's Corsicana web page (undated) describes the site as built for AI/HPC workloads, with a 168 MW core-and-shell expansion building and a direct 345 kV transmission interconnection.
The full record
- Status note
- The bitcoin mine has been energized since 2024; construction of the first AI/HPC core-and-shell building began in 2026.
- Power note
- Riot lists the site at 1.0 GW of power capacity; it says the prospective data center campus would hold up to 756 MW of IT load in 4.5 buildings of 168 MW each.
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)