Planned multi-phase AI campus on 438 acres outside Odessa, combining grid power with on-site natural gas generation. Also known as: TCDC.
Who is behind it
Stream Data Centers (non-binding LOI)
The record, newest first
In its quarterly report, New Era said it was working toward an industrial district designation, site clearing and a lease with an investment-grade hyperscaler. (RedChip (New Era Energy & Digital release), May 15, 2026)
New Era signed a non-binding letter of intent with Stream Data Centers to develop and operate the campus, outlining a 200 MW first phase and a path past 1 GW. (Business Wire (New Era Energy & Digital), April 1, 2026; DatacenterDynamics, undated)
New Era reported in an SEC filing that it had completed the purchase of Sharon AI's 50% interest in TCDC for $70 million in total consideration. (U.S. SEC (New Era Energy & Digital, Inc.), Jan. 20, 2026)
TCDC hired EYP Mission Critical Facilities to engineer the planned 438-acre campus. (Business Wire (New Era Energy & Digital), Oct. 30, 2025)
New Era Helium and Sharon AI announced a letter of intent with GROW Odessa for about 200 acres in Ector County for a 250 MW AI/HPC campus with gas-fired power. (CBS7 / KOSA (firstalert7.com), Feb. 28, 2025)
Conflicts and open questions
- Coordinates are city-level (Odessa). The April 2026 release places the campus next to Vistra and Calpine generation, but no parcel was found.
- New Era Energy & Digital was formerly New Era Helium.
The full record
- Status note
- Pre-construction; company is pursuing an industrial district designation and construction permits, Stream joint venture is a non-binding LOI and a hyperscale lease was not final as of May 2026.
- Power note
- Phase 1 of about 200 MW on utility power; about 450 MW of on-site gas generation in Phase 2 and stated ambitions of 1 GW to 1.4 GW. Earlier plans cited 90 MW and then 250 MW.
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)