Data center campus · 2602 Longwood Drive, Southwest Industrial Park, Brenham, Washington County, Texas
Viridien US HPC Hub
Proposed
as of April 2026
Viridien, the French geoscience firm formerly called CGG, plans a high-performance computing center for its own subsurface imaging work on a 21-acre industrial site in Brenham.
Power21MW reported · stated
Floor area40,262sq ft
Site21acres
IT load3MW
Who is behind it
ProjectViridien US HPC Hub
Developer and teamViridien (formerly CGG) (through CGG Services (U.S.) Inc.)
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
Viridien published project details: 5 MW to start, up to 21 MW if expanded, air-based closed-loop cooling and a dedicated Bluebonnet power feed. (KWHI, April 1, 2026; Viridien, Oct. 30, 2026)
The Brenham City Council unanimously voted down a reinvestment zone that would have allowed a tax phase-in; Viridien said it would go ahead anyway. (KWHI, Jan. 9, 2026; DatacenterDynamics, Jan. 9, 2026)
CGG Services registered a $50 million, 40,262 sq ft data center building with the state. (Texas Department of Licensing and Regulation (TABS), Dec. 10, 2025)
Conflicts and open questions
- Under 50 MW.
- Reported plans call for up to three roughly 40,000 sq ft buildings and moving Viridien's Americas hub from Houston over time.
- A resident petition opposing the project was reported by DCD.
The full record
- Status note
- State filing shows construction to start Jan. 1, 2027, finishing Oct. 1, 2027; Viridien earlier said construction would begin in early 2026.
- Power note
- 5 MW total load (3 MW IT) initially, with up to 21 MW (15 MW IT) if expanded, per Viridien. DCD reported 45 MW total at full build.
- Evidence
- Primary public records
- Size class
- Under 50 MW (outside main scope; kept for completeness)