A 145-acre PowerHouse data center campus at Cosner's Corner announced at up to 800 MW, which broke ground in 2024.
Power800MW reported · stated
Floor area3,500,000sq ft
Site145acres
Who is behind it
ProjectPowerHouse 95 campus
Developer and teamPowerHouse Data Centers (American Real Estate Partners)
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
PowerHouse broke ground on the campus. (DatacenterDynamics, undated; DatacenterDynamics, undated)
PowerHouse said it had closed on 145 acres along the I-95 corridor for a campus of up to eight buildings and 3.5 million sq ft, with the first 150 MW substation expected by October 2025. (PowerHouse Data Centers (PR Newswire), Jan. 23, 2024)
Conflicts and open questions
- DCD (undated copy) reported a later Army Corps (Norfolk District) filing for a three-building second phase with about 2.3 acres of wetland impact; date it before adding as an event.
- No county zoning record was opened; whether the site was by-right is not stated.
- Up to 3.5 million sq ft in eight buildings at announcement; a later filing described up to seven buildings and 1.75 million sq ft.
The full record
- Status note
- Ground was broken in mid-2024; a second phase was filed with the Army Corps later.
- Power note
- The developer announced up to 800 MW over three substations, with a first 150 MW phase due by October 2025; a later DCD report gave up to 300 MW, possibly 900 MW eventually. Figures conflict.
- Evidence
- News reports; primary records not yet obtained
- Size class