Data center campus · 200 North Nash Street and 2260 East El Segundo Boulevard, El Segundo, Los Angeles County, California
Digital Realty El Segundo (LAX11 and LAX12)
Operating
as of Nov. 2026
Two nearby Digital Realty colocation buildings in El Segundo. Also known as: Digital Realty LAX11, Digital Realty LAX12, 200 North Nash Street, 2260 East El Segundo Boulevard.
PowerNot statedNot reported in the records found
Floor area245,500sq ft
Who is behind it
ProjectDigital Realty El Segundo (LAX11 and LAX12)Also: Digital Realty LAX11, Digital Realty LAX12, 200 North Nash Street, 2260 East El Segundo Boulevard
Developer and teamDigital Realty
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
Digital Realty lists LAX11 at 113,500 square feet on two levels. (Digital Realty, undated)
A fire in a colocation room at LAX12 shut down two suites, according to Baxtel, which cited Digital Realty and a tenant's report. (Baxtel, May 26, 2023)
Digital Realty's factsheet lists LAX12 at 132,000 square feet on two levels. DatacenterDynamics reports 18 MW there. (Digital Realty, undated; DatacenterDynamics, undated)
Conflicts and open questions
- The square footage adds the two buildings. The LAX12 factsheet misprints its size as 132,00; DatacenterDynamics gives 132,000.
- DatacenterDynamics reports 18 MW at LAX12. No figure was found for LAX11, so the campus megawatt field is left empty.
- Treated as one campus because they share an operator and sit about 300 meters apart by address (Census geocoder). Digital Realty names them separately.
The full record
- Status note
- Operator lists LAX11 as of Nov. 2026. The LAX12 factsheet has a 2023 copyright and no other date; its current page could not be opened.
- Evidence
- Primary public records
- Size class
- Under 50 MW (outside main scope; kept for completeness)