Global Stack proposal, Ventura County Fairgrounds
A fair board ended talks on a 100-year lease for a shipping-container-sized computing unit, parking structure and vertiport. Also known as: Resilience Edge Compute.
Who is behind it
The record, newest first
The Earl Warren Showgrounds CEO in Santa Barbara said he had declined a memorandum and made no commitment, and would bring the matter to his board as an informational item. (Santa Barbara News-Press, Oct. 15, 2026)
The board voted 5-3 to end talks and give 30-day notice on the memorandum, at a meeting drawing about 200 residents. (Ojai Valley News / Ventura County Sun, Sept. 17, 2026; Santa Barbara News-Press, Sept. 17, 2026)
The company described the unit as emergency infrastructure that could also handle everyday data; the fairgrounds held a nonbinding memorandum of understanding. (Spectrum News, Sept. 4, 2026)
The Chronicle reported a company presentation calling for 8 to 10 MW per site, and early talks with the Cow Palace and San Mateo County Event Center, and that Calistoga had dropped the idea. (San Francisco Chronicle via Yahoo News, July 8, 2026)
The company presented at Calistoga Fairgrounds to an advisory committee, which took no vote. (NorCal Public Media (Bay City News), June 25, 2026)
Conflicts and open questions
- Part of a pitch to as many as 70 California fairgrounds; the company says its systems are not traditional data centers. The company appears as both Global Stack LLC and Global Stack USA.
- Other sites with no separate record: Calistoga (informational hearing June 2026, no vote; the Chronicle says the idea was dropped), Cow Palace and San Mateo County Event Center (early talks per the Chronicle), and Earl Warren Showgrounds in Santa Barbara, whose CEO said he signed no memorandum.
The full record
- Status note
- A fair board, not a permitting agency, voted to end talks and give notice on the memorandum; no permit application is reported.
- Power note
- Under 50 MW as pitched: a company presentation called for 8 to 10 MW per site. No figure was reported for this site.
- Evidence
- News reports; primary records not yet obtained
- Size class
- Under 50 MW (outside main scope; kept for completeness)