Data center campus · 1100 North Market Boulevard, Sacramento, Sacramento County, California

QTS Sacramento (SAC1)

Operating as of Nov. 2026

QTS lists a data center of about 92,600 square feet with its own substation on North Market Boulevard.

Cite← California data centers
Alameda CountyAlpine CountyAmador CountyButte CountyCalaveras CountyColusa CountyContra Costa CountyDel Norte CountyEl Dorado CountyFresno CountyGlenn CountyHumboldt CountyImperial CountyInyo CountyKern CountyKings CountyLake CountyLassen CountyLos Angeles CountyMadera CountyMarin CountyMariposa CountyMendocino CountyMerced CountyModoc CountyMono CountyMonterey CountyNapa CountyNevada CountyOrange CountyPlacer CountyPlumas CountyRiverside CountySacramento CountySan Benito CountySan Bernardino CountySan Diego CountySan Francisco CountySan Joaquin CountySan Luis Obispo CountySan Mateo CountySanta Barbara CountySanta Clara CountySanta Cruz CountyShasta CountySierra CountySiskiyou CountySolano CountySonoma CountyStanislaus CountySutter CountyTehama CountyTrinity CountyTulare CountyTuolumne CountyVentura CountyYolo CountyYuba CountyQTS Sacramento (SAC1) · Operating · 4 MW
Power4MW reported · stated
Floor area92,644sq ft
IT load4MW

Who is behind it

ProjectQTS Sacramento (SAC1)
Developer and teamQTS Data Centers
End userNot found in the recordsNot yet named in any record or credited report we have found.

The record, newest first

  1. QTS's own page listed 4 MW of critical power and 92,644 sq ft, 46,000 of it raised floor. (QTS Data Centers, undated)

  2. The site's PeeringDB entry, under QTS Realty Trust, was last updated. (PeeringDB, Sept. 26, 2025)

  3. A QTS data sheet, undated but marked copyright 2024, listed the site at 4 MW or more of critical power in a building of over 92,000 sq ft, with an on-site substation. (QTS Data Centers, 2024)

Conflicts and open questions

  • The data sheet's year comes from its copyright line; its web path suggests July 2024, but no month is printed.
  • QTS's pages do not name the utility, so utility and grid fields are left blank.
  • Opening date not found in a page opened.

The full record

Status note
QTS's undated page still listed the site in Nov. 2026, describing current space; it does not state a status or an opening date.
Power note
QTS's page gives 4 MW of total critical power; its data sheet says 4 MW or more. Under 50 MW.
Evidence
Primary public records
Size class
Under 50 MW (outside main scope; kept for completeness)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.