Data center campus · 10105 David Taylor Drive, Charlotte, Mecklenburg County, North Carolina

Flexential Charlotte North data center

Operating as of Nov. 2, 2026

Flexential's Charlotte North site has a 62,589-square-foot footprint after a 2019 expansion added about 20,000 square feet.

Cite← North Carolina data centers
Alamance CountyAlexander CountyAlleghany CountyAnson CountyAshe CountyAvery CountyBeaufort CountyBertie CountyBladen CountyBrunswick CountyBuncombe CountyBurke CountyCabarrus CountyCaldwell CountyCamden CountyCarteret CountyCaswell CountyCatawba CountyChatham CountyCherokee CountyChowan CountyClay CountyCleveland CountyColumbus CountyCraven CountyCumberland CountyCurrituck CountyDare CountyDavidson CountyDavie CountyDuplin CountyDurham CountyEdgecombe CountyForsyth CountyFranklin CountyGaston CountyGates CountyGraham CountyGranville CountyGreene CountyGuilford CountyHalifax CountyHarnett CountyHaywood CountyHenderson CountyHertford CountyHoke CountyHyde CountyIredell CountyJackson CountyJohnston CountyJones CountyLee CountyLenoir CountyLincoln CountyMacon CountyMadison CountyMartin CountyMcDowell CountyMecklenburg CountyMitchell CountyMontgomery CountyMoore CountyNash CountyNew Hanover CountyNorthampton CountyOnslow CountyOrange CountyPamlico CountyPasquotank CountyPender CountyPerquimans CountyPerson CountyPitt CountyPolk CountyRandolph CountyRichmond CountyRobeson CountyRockingham CountyRowan CountyRutherford CountySampson CountyScotland CountyStanly CountyStokes CountySurry CountySwain CountyTransylvania CountyTyrrell CountyUnion CountyVance CountyWake CountyWarren CountyWashington CountyWatauga CountyWayne CountyWilkes CountyWilson CountyYadkin CountyYancey CountyFlexential Charlotte North data center · Operating · 3.3 MW
Power3.3MW reported · stated
Floor area62,589sq ft
IT load3.3MW

Who is behind it

ProjectFlexential Charlotte North data center
Developer and teamFlexential
End userNot found in the recordsNot yet named in any record or credited report we have found.

The record, newest first

  1. Flexential's data sheet and tour guide list the site at 62,589 square feet. (Flexential, Nov. 2, 2026; Flexential, Nov. 2, 2026)

  2. DatacenterDynamics reported an expansion of 20,000 square feet and 1.5 MW, bringing the site to 62,589 square feet and 3.3 MW. (DatacenterDynamics, June 24, 2019)

  3. Peak 10, later rebranded Flexential, described a 64,000-square-foot campus at 10105 David Taylor Drive, its fourth Charlotte data center, and a 6,000-square-foot addition. (Peak 10 release, via Channel Futures, Aug. 30, 2016; DatacenterDynamics, undated)

Conflicts and open questions

  • Flexential's tour guide gives two UPS figures for this site, 3.3 MW in its quick facts and 6.75 MW in its power section, unexplained. The 3.3 MW figure matches the data sheet and the 5.66 MW metro total on Flexential's page.
  • Flexential's documents give no street address. A 2016 release by predecessor Peak 10 places a 64,000-square-foot campus at 10105 David Taylor Drive; only a directory labels that address Charlotte - North.
  • Under 50 MW.

The full record

Power note
3.3 MW critical-load UPS capacity per Flexential; its tour guide also shows 6.75 MW.
Evidence
Primary public records
Size class
Under 50 MW (outside main scope; kept for completeness)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.