Data center campus · Maries Road and Moran Road, Sterling, Loudoun, Virginia
EdgeCore Ashburn campus
Under construction
as of Sept. 24, 2025
EdgeCore's two-building, 114 MW campus on Maries Road and Moran Road in Sterling, under construction with first delivery planned for late 2026. Also known as: EdgeCore AS01, EdgeCore AS02.
Power114MW reported · stated
Floor area685,000sq ft
Site17acres
IT load114MW
Who is behind it
ProjectEdgeCore Ashburn campusAlso: EdgeCore AS01, EdgeCore AS02
Developer and teamEdgeCore Digital Infrastructure
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
EdgeCore's location page lists the two-site Sterling campus at 114 MW and 685,000 square feet on 17 acres, with first delivery in late 2026. (EdgeCore Digital Infrastructure, Oct. 31, 2026)
EdgeCore topped out AS01, the first building, with both facilities expected to deliver in 2026. (DatacenterDynamics, Sept. 26, 2025)
Conflicts and open questions
- Campus size reported as 608,000 sq ft (DCD, Sept 2025) and 685,000 sq ft (EdgeCore page); the developer figure is used.
- The two buildings sit on separate sites under two miles apart; treated as one campus as EdgeCore presents it.
- EdgeCore page source date is the date accessed; the page shows no publish date.
- Coordinates approximate, placed on Maries Road in Sterling.
The full record
- Status note
- First building (AS01) topped out September 2025; EdgeCore lists initial delivery in late 2026.
- Power note
- 114 MW critical IT load for the campus: 72 MW at AS01 and 42 MW at AS02 per DCD.
- Evidence
- Primary public records
- Size class
- 50 MW or more (tracker scope)