Data center campus · 3011 S 52nd St, Suite 107, Tempe, Maricopa County, Arizona

EdgeConneX PHX01 (Phoenix Edge Data Center)

Operating as of March 23, 2026

A small multi-tenant edge colocation building that EdgeConneX operates in Tempe, near the ASU campus, with about 79,200 sq ft of space. Also known as: EdgeConneX Phoenix Edge Data Center, EDCPHX01.

Cite← Arizona data centers
Apache CountyCochise CountyCoconino CountyGila CountyGraham CountyGreenlee CountyLa Paz CountyMaricopa CountyMohave CountyNavajo CountyPima CountyPinal CountySanta Cruz CountyYavapai CountyYuma CountyEdgeConneX PHX01 (Phoenix Edge Data Center) · Operating · 4.5 MW
Power4.5MW reported · stated
Floor area79,200sq ft

Who is behind it

ProjectEdgeConneX PHX01 (Phoenix Edge Data Center)Also: EdgeConneX Phoenix Edge Data Center, EDCPHX01
Developer and teamEdgeConneX
End userNot found in the recordsNot yet named in any record or credited report we have found.

The record, newest first

  1. EdgeConneX's Phoenix location page still describes PHX01 as a 79,200 sq ft facility with 17,300 sq ft of raised floor. (EdgeConneX, March 23, 2026)

  2. EdgeConneX's 2024 Phoenix data sheet listed 4.5 MW in service at the Tempe building, scalable to 6.5 MW, with 17,300 sq ft of raised floor. (EdgeConneX, Sept. 2024)

  3. An EdgeConneX data sheet listed 1.5 MW in service at the Tempe building, planned to reach 6.5 MW, plus room for 10,000 more sq ft of raised floor. (EdgeConneX, Feb. 1, 2023)

  4. EdgeConneX announced that the Phoenix-IX exchange would place a node in its Tempe edge facility on S 52nd St. (EdgeConneX, Sept. 12, 2016)

Conflicts and open questions

  • Not the same campus as edgeconnex-mesa: the operator treats the Tempe building and the Mesa build-to-suit land as separate offerings.
  • The 2023 and 2024 data sheet dates come from their upload paths; the sheets show no date.
  • Raised floor grew from 9,300 sq ft (2023 sheet) to 17,300 sq ft (2024 sheet and current page).
  • Coordinates approximate from the street address.

The full record

Status note
Listed as a live facility on EdgeConneX's Phoenix location page (page last modified March 2026).
Power note
EdgeConneX's 2024 Phoenix data sheet gives 4.5 MW (N+1) in service, scalable to 6.5 MW; its 2023 sheet gave 1.5 MW.
Evidence
Primary public records
Size class
Under 50 MW (outside main scope; kept for completeness)
Map position approximate, from the reported address or area. Updated Oct. 17, 2026.