CoreSite's Santa Clara buildings stand on Stender Way and Coronado Drive; the newest, SV9, was finished in 2025. Also known as: SV3, SV4, SV7, SV8, SV9.
PowerNot statedNot reported in the records found
Who is behind it
ProjectCoreSite Santa Clara (SV3, SV4, SV7, SV8, SV9)Also: SV3, SV4, SV7, SV8, SV9
Developer and teamCoreSite
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
CoreSite's location page and brochure list these Santa Clara buildings, and its spec sheet gives SV9's address. (CoreSite, undated; CoreSite, undated; CoreSite, undated)
CoreSite said SV9 was complete and added more than 228,000 square feet. (CoreSite, July 30, 2025)
CoreSite described SV9 as a 240,000-square-foot building with 34 MW of IT load and its own utility substation, with a first phase due in early 2024. (CoreSite, May 23, 2023)
Conflicts and open questions
- Building addresses: SV3 at 2901 Coronado Drive, SV4 at 2972 Stender Way, SV7 at 3020 Coronado Drive, SV8 at 3035 Stender Way, SV9 at 2915 Stender Way (CoreSite).
- Sizes CoreSite lists: SV4 101,000+, SV7 227,000+, SV8 161,000+ and SV9 228,000+ square feet. SV3 is in its brochure but not on its web list.
- CoreSite has given SV9 as 200,000, 228,000 and 240,000 square feet in different documents.
- CoreSite's market-wide campus also covers SV1 in San José and SV2 in Milpitas. Those are miles away and are not in this record. SV5 and SV6 have no address in what we opened.
The full record
- Status note
- CoreSite announced that SV9 was finished on this date. Its spec sheet calls SV9 its newest site.
- Power note
- No campus total is stated. CoreSite gave 34 MW of IT load for SV9 alone in 2023.
- Evidence
- Primary public records
- Size class
- Under 50 MW (outside main scope; kept for completeness)