Data center campus · Bounded by High Falls Road, South McDonough Road and Highway 16 (Arthur K. Bolton Parkway), east of Griffin, Spalding County, Georgia
Spalding Investments data center campus
Approved
as of Oct. 23, 2025
A six-building campus of about 1.42 million sq ft on 127 acres that Spalding commissioners approved 5-0 in October 2025 with 23 conditions.
PowerNot statedNot reported in the records found
Floor area1,420,000sq ft
Site127.45acres
Who is behind it
ProjectSpalding Investments data center campus
Developer and teamSpalding Investments (through Spalding Investments, LLC)
End userNot found in the recordsNot yet named in any record or credited report we have found.
The record, newest first
Commissioners approved the rezoning and special exception 5-0 each with 23 conditions, after a redesign to six buildings of the same total area and with a 289-signature petition in opposition. (Griffin Daily News, Nov. 1, 2025)
The planning commission voted 3-0 for the rezoning and 2-0-1 for the special exception on a plan with eight two-story buildings. (Griffin Daily News, June 28, 2025; DatacenterDynamics, undated)
Conflicts and open questions
- Conditions include a closed-loop cooling system, a noise study before land disturbance, generator walls, 50-foot buffers and decommissioning rules; commissioners may initiate a rezoning if no land disturbance permit is issued within six years.
- Separate applicant and parcel from Project Spalding, across High Falls Road.
- MW not stated in sources opened.
The full record
- Status note
- No later construction or permit record was found.
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)