Data center campus · South Gateway Blvd., west of SW Kanner Hwy. and south of SW 96th St., near Stuart (South Florida Gateway PUD), Martin County, Florida
Treasure Coast Gateway data center
Proposed
as of Oct. 12, 2026
A 130 MW, four-building data center proposed on industrial land off Kanner Highway; WPTV reports it is the first such proposal in unincorporated Martin County. Also known as: Kanner Highway hyperscale proposal.
Power130MW reported · stated
Who is behind it
ProjectTreasure Coast Gateway data centerAlso: Kanner Highway hyperscale proposal
Developer and teamPanorama Holdings LLC (North Carolina), as Treasure Coast Gateway LLC
End userNot disclosed.
The record, newest first
County Commission adopts a one-year moratorium; the county attorney says this application, filed earlier, is not covered and may get administrative approval because of the site's industrial zoning. (TCPalm / Treasure Coast Newspapers (via Yahoo News), Oct. 27, 2026; WQCS, Oct. 29, 2026; WPTV, Oct. 27, 2026)
Treasure Coast Gateway LLC files a data center application for land in the South Florida Gateway PUD; the plan calls for four buildings and 130 MW. (TCPalm / Treasure Coast Newspapers (via Yahoo News), Oct. 27, 2026)
Conflicts and open questions
- Coordinates approximate, from the stated location near SW Kanner Hwy. and SW 96th St.; no street address given.
- Square footage conflicts: TCPalm prints '959 square feet', apparently a typo; WQCS reports 959,000 sq ft. sqft left null until a county record is found.
- mw_basis 'stated' reflects the developer's application as described by TCPalm; the application itself was not opened.
- Commissioner Stacey Hetherington recused herself from the moratorium vote because she works on behalf of Ferreira Construction, which proposed Project Silver Fox (TCPalm).
The full record
- Status note
- Application filed Oct. 12, 2026, before Martin County's moratorium; the county attorney says it falls outside the moratorium and could be approved by staff without a commission vote.
- Power note
- 130 MW as stated in the developer's application, per TCPalm.
- Evidence
- News reports; primary records not yet obtained
- Size class
- 50 MW or more (tracker scope)